Towable Concrete Mixer STD HD GX160 5HP

Towable Concrete Mixer STD HD GX160 5HP
Weight:295KGs
Product Description:Drum volume 400L Dry mix input 310L, Wet Mix output 260L
Application:Mixers are used when a small quantity of concrete is reguired. These mixers are used by small medium or large contractors and companies or individuals who need to mix concrete.
Safety:

This product should not be operated unless proper training has been supplied to the person operating the equipment.

Personal protection gear includes: goggels, steel-cap boots, gloves, ear plugs, dust mask, hard-hat.

Starting:
  • Turn petrol on
  • Open choke (butterfly closes to close off air flow)
  • Pull recoil 1/3 of way twice
  • Pull recoil full way until starts (usually 2 pulls)
  • Close choke (butterfly opens the air flow)
Running machine:Always check oil level and v-belt before operation. Do not grease the ring gear. Check the geras for wear regularly by testing the machine under load. Always wash the machine own when the work for the day is complet. Check the revs of the drum should not be more than 25rpm or the concrete wont mix. Always advise operators of the mixers capacity.
Do's and Donts:Dont operate the machine without a recoil starter cover. Keep hands and parts clear of all working parts. Dont place any objects other than sand, stone and cement in the drum.
Shutting Down:Turn On/Off switch off. Close fuel line.
Re-fueling:
  • Ensure petrol switch is off before refuelling.
  • Machine may not be running whilst refueling.
  • Do not smoke or use a cell phone whilst refueling.
  • Remove fuel cap and place in clean dry area within reach of the machine.
  • Pour the fuel into the tank.
  • Replace fuel cap and move fuel container.
  • Do not place any plastice bags around the fuel cap as this will close the breather hole in the cap.

 

Maintanance Checklist:

 

  1. Clean machine
  2. Clean / replace spark plug
  3. Clean / replace air filter
  4. Check all bolts and nuts
  5. Clean carburetor and jets
  6. Check starter rope and coil
  7. Drain oil and replace (20w50)
  8. Check fan belts

 

Testing Equipment Before Hire:

The equipment must be clean and must have a service tag attached to ensure that the workshop completed the standard service before returning the asset to the floor.

The equipment must be taken to the testing station applicable where you will test the machine in front of the customer whislt demonstrating the operation of the asset to the customer.

Ensure that the required safety attire is worn before beginning the equipment test and instruction to the customer and ensure that the customer is in a safe location.

Start the equipment as per the above instruction.

Demonstrate the operation of the equipment as per the operating instructions above.

Shut the equipment down.

The customer must sign that he has recieved training.